Construction Methodology for Air Domes

Introduction

Installing an air dome is a complex process that requires careful planning and execution. This guide provides a detailed overview of the construction methodology for air domes, ensuring a secure and efficient setup.

Air Dome Installation Completed Air Dome

Step-by-Step Installation Guide

1. Site Preparation

  • Clear the site of all obstructions and level the ground.
  • Prepare the surface, ensuring that it is smooth and free of sharp objects.
  • Lay a protective film over the entire area to prevent damage to the air dome membrane.

2. Membrane Installation

  • Unroll the air dome membrane and position it correctly.
  • Join the membrane sections using high-frequency welding technology, ensuring a secure and airtight connection.
Unfolding Air Dome Fabric

3. Anchoring

  • Drill holes and install chemical anchors into a concrete ring beam around the perimeter of the dome site.
  • Attach L-profiles to these anchors, which will secure the membrane's bottom edge.
  • For steel tube anchoring, install rings into the anchoring and then install anchoring tubes through the membrane sleeve and rings.
  • Ensure the membrane's edges are pressed tightly against the ground, without any gaps.

4. Structural Installations

  • Position and secure the revolving entrance doors and emergency exits into self-supporting structures anchored to concrete pads.
  • Install the main ventilation and heating/cooling units, as well as any additional systems such as destratifiers or optional ventilation systems.

5. Inflation and Adjustments

  • Inflate the air dome gradually, monitoring for any issues or misalignments.
  • Adjust the membrane and ensure it is properly fitted to the anchoring system.
  • Check all joints and connections, ensuring they are secure and airtight.
  • Attach and secure all air inflation ducts and electrical components, including lighting and monitoring systems.

6. Final Checks

  • Conduct a thorough inspection of the entire setup, checking for proper installation of anchors, membranes, and all mechanical and electrical systems.
  • Verify that the air dome's pressure is maintained correctly, using the installed sensors and control systems.
  • Verify that air dome's temperature sensors and heating work correctly, perform burner check.
  • Ensure all safety features, including emergency exits and ventilation controls, are operational and accessible.
Final Check of Air Dome

7. Operation and Maintenance

  • Regularly check and maintain the air dome's structure, especially after severe weather conditions.
  • Remove any accumulated snow from the air dome to prevent structural damage.
  • Perform routine inspections of the main and emergency ventilation units to ensure proper functioning and safety.

Technological Features

  • Double-layer Membrane: Provides superior insulation, reducing heating and cooling costs.
  • Automated Environmental Control: Systems manage overpressure, ventilation, and lighting to ensure optimal conditions inside the dome.
  • Backup Systems: Diesel-operated backup aggregates maintain operations during power outages, ensuring uninterrupted use.